Then my question would be, what do i write at process step 2, where i do not assemble?
I thought like this, for process step 2 (where i only check the product) Failure mode: Waves Effect of failure: bad appearance at customer (or...
I am checking the "design" because i glue a pipe on a fabric. if i do not glue this pipe correctly (eg. one side of the pipe is too up or too low...
Hello all, I have a question, something i am not sure i understood correctly about the PFMEA. I am talking about a sunshade, which afterwards the...
Separate names with a comma.