Hi, I have a question about the use of go/no-go gauges. As per the engineering drawings, there are some dimensions that have to be checked at...
No unfortunately the will not be able to do that.
Thanks Eric. No, it will take a couple weeks to weld the 50 parts. To make things even more complicated, during the manufacturing, we have to send...
Hi all, My question is about job traveler traceability. We are a small manufacturing shop and produce hollow shafts. These shafts are comprised of...
Thank you for your comments. So I think the conclusion is that, for instance, for manufacturing of a simple shaft, the Engineer who designed the...
Hi all, I am not sure if this has been asked before (and apologies if it is a duplicate), but I am wondering which department is responsible for...