1. This site uses cookies. By continuing to use this site, you are agreeing to our use of cookies. Learn More.
Dismiss Notice
You must be a registered member in order to post messages and view/download attached files in this forum.
Click here to register.

How is 8.5.2.4 implemented

Discussion in 'IATF 16949:2016 - Automotive Quality Systems' started by MCW8888, Aug 24, 2015.

  1. MCW8888

    MCW8888 Well-Known Member

    Joined:
    Aug 17, 2015
    Messages:
    642
    Likes Received:
    198
    Trophy Points:
    42
    :confused::confused: I need help in the implementation of section 8.5.2.4. I am confused of the cycle time being consistent with the determination of root cause. Thank you.
     
  2. Chris Glover

    Chris Glover Active Member

    Joined:
    Aug 7, 2015
    Messages:
    54
    Likes Received:
    32
    Trophy Points:
    17
    8.5.2.4 Rejected product test/analysis
    The organization shall analyze parts rejected by the customer's manufacturing plants, engineeringfacilities and dealerships. The organization shall minimize the cycle time of this process. Records of these analyses shall be kept and made available upon request. The organization shall perform analysis and initiatecorrective action to prevent recurrence.

    NOTE: Cycle time related to rejected product analysis should be consistent with the determination of root cause, corrective action and monitoring the effectiveness of implementation.


    I think the cycle time referred to here is the time used to do the analysis of the rejects, not the cycle time of the manufacturing process.
     
    David Bradley likes this.
  3. MCW8888

    MCW8888 Well-Known Member

    Joined:
    Aug 17, 2015
    Messages:
    642
    Likes Received:
    198
    Trophy Points:
    42
    Thank you Chris. But how will this clause fiffer from 8.5.2.
     
  4. Chris Glover

    Chris Glover Active Member

    Joined:
    Aug 7, 2015
    Messages:
    54
    Likes Received:
    32
    Trophy Points:
    17
    8.5.2 is the ISO section of the clause..8.5.2.4 provides further requirements as part of TS
     
  5. MCW8888

    MCW8888 Well-Known Member

    Joined:
    Aug 17, 2015
    Messages:
    642
    Likes Received:
    198
    Trophy Points:
    42
    Thank you Chris
     
  6. Hansraj Sharma

    Hansraj Sharma Member

    Joined:
    Sep 11, 2015
    Messages:
    5
    Likes Received:
    1
    Trophy Points:
    2
    Location:
    Haridwar India
    Here the cycle time is
    Time between getting the part----to------analyze -----action planning and implementation .