Does anyone have examples of custom Severity, Occurrence and Detection tables for use on machined components? There's no way that (in general)...
As I understand correctly, there are differing opinions around the ranking scale of 1-10 vs 1-5 vs no numbers, whether to multiple the values or...
Hi, During some training on FMEAs, I saw a matrix that looked helpful. It lists all the processes used in all production, the common failure...
Does anybody have had any experience on some process to approve a PFMEA? I mean, after the PFMEA has been created, is there a protocol to approve...
Does anyone have a generic PFMEA (secondarily a C Plan) for a small machine shop that does 1 to 10 piece precision orders? Receive, Lathe side 1,...
We have Control Plan (CP) and PFMEA in our company, and every time that we receive a drawing, management wants so add every note of the Drawing to...
Separate names with a comma.