1. This site uses cookies. By continuing to use this site, you are agreeing to our use of cookies. Learn More.
Dismiss Notice
You must be a registered member in order to post messages and view/download attached files in this forum.
Click here to register.

8.5.2: Identify the status of outputs

Discussion in 'ISO 9001:2015 - Quality Management Systems' started by Gerald, Aug 11, 2016.

  1. Gerald

    Gerald Member

    Joined:
    Mar 2, 2016
    Messages:
    13
    Likes Received:
    4
    Trophy Points:
    2
    "The organization shall identify the status of outputs with respect to monitoring and measurement requirements throughout production and service provision."

    Can anyone shed some light on this?
     
  2. Eric Twiname

    Eric Twiname Well-Known Member

    Joined:
    Jul 31, 2015
    Messages:
    329
    Likes Received:
    232
    Trophy Points:
    42
    Location:
    Northeast USA
    When test A, test B and test C are required to consider a part complete, you have to know whether test A has been done yet or not...whether test B has been done yet or not...and whether test C was done yet or not...and whether the outputs of the tests done meet requirements (specs).

    If you define it necessary to monitor water content throughout your process at a certain level, you have to know whether water content was monitored throughout your process, and what the levels were.

    Cold, weird wording...but simple, important requirement. If you require it to be done...is it being done?
     
  3. normzone

    normzone Well-Known Member

    Joined:
    Aug 3, 2015
    Messages:
    137
    Likes Received:
    77
    Trophy Points:
    27
    When a product is ready to ship, how can you prove that it was finished being built, inspected and tested as applicable?

    For our products, build documentation (travelers is a commonly used term) with serial numbers that match the S/N on the unit, and completion of the build, inspection and test portions with either persons signatures or stamps meet that requirement.

    If your product line differs, you may need a different solution.
     
  4. tony s

    tony s Well-Known Member

    Joined:
    Sep 10, 2015
    Messages:
    1,350
    Likes Received:
    1,055
    Trophy Points:
    112
    Location:
    Laguna Philippines
    The definitions given in ISO 9000:2015 can help.
    Monitoring - determining the status of a system, a process, a product, a service, or an activity.
    Measurement - process to determine a value.

    Statuses related to monitoring can include:
    • Cpk, dppm, stability of production;
    • actual yield against the target;
    • percent of project completion;
    • condition of patient in a hospital;
    • exact location of cargo in transit, etc.
    Statuses related to measurement will include: Pass/Fail, Accept/Reject, Go/NoGo, Approved/Disapproved, Hold, For Further Verification, etc.