SPC that uses the variance among samples rather than among observations within a sample?

Discussion in 'SPC - Statistical Process Control' started by kmacqe, Sep 11, 2019.

  1. kmacqe

    kmacqe New Member

    Joined:
    Sep 11, 2019
    Messages:
    3
    Likes Received:
    0
    Trophy Points:
    1
    We have a laboratory process that processes batches of 96 samples at a time. The average of each batch is recorded in an Xbar-s chart. The variability within a batch is very small and the variability between batches is much larger. It is expected that the batches will be quite variable and this does not indicate a process issue. Because the intra-batch variability is so small, the control limits are very narrow and every batch looks to be out of control, even though we know the process is not out of control (at least based upon this metric). As a result, we do not use the LCL and UCL to make determinations about process health and we do not apply the typical SPC tests because they fail with almost every batch. I would like to apply meaningful statistics to this metric and be able to detect when there is actually a process issue.

    Is there an alternate way to compute control limits that uses the variance among samples (variance among batches) rather than among observations within a sample (among the 96 samples in a batch)? Or is there a different statistical test that I can apply that is more appropriate?
     
  2. Miner

    Miner Moderator Staff Member

    Joined:
    Jul 30, 2015
    Messages:
    577
    Likes Received:
    493
    Trophy Points:
    62
    Location:
    Greater Milwaukee USA
    If the within batch variation is that small (possibly measurement variation), you might consider using an individuals control chart, which uses a moving range between batches.
     
    tony s and Bev D like this.
  3. Bev D

    Bev D Moderator Staff Member

    Joined:
    Jul 30, 2015
    Messages:
    606
    Likes Received:
    664
    Trophy Points:
    92
    Location:
    Maine
    This is not uncommon in batch processes. You have a non-homogenous process.

    Remember that the ‘traditional’ Shewhart charts that use piece to piece (within subgroup) variation to create the control limits for the subgroup averages is only valid when the process is homogenous. In other words the process average is directly related to the standard deviation. In physics terms this occurs when the process location (average) and the process variation (standard deviation):are controlled by the same factor(s). Many batch processes have their location and variation controlled by different factors.

    So Miner’s suggestion to use the I,MR chart for the batch averages is spot on. It is not a work around, it’s exactly what the physics and the statistics require. You can add a simple S chart to monitor the within batch variation.
     
    tony s likes this.
  4. kmacqe

    kmacqe New Member

    Joined:
    Sep 11, 2019
    Messages:
    3
    Likes Received:
    0
    Trophy Points:
    1
    Great suggestion! Thank you!
     
  5. kmacqe

    kmacqe New Member

    Joined:
    Sep 11, 2019
    Messages:
    3
    Likes Received:
    0
    Trophy Points:
    1
    Thank you! I like the idea of adding an s chart to monitor the intra-batch variation.